log [2019/06/22 07:33] – [16th Week Report (2019-06-17 to 2019-06-21)] team4log [2019/06/22 07:35] (current) – [17th Week Report (2019-06-24 to 2019-06-27)] team4
Line 49: Line 49:
  
 ==== 17th Week Report (2019-06-24 to 2019-06-27)==== ==== 17th Week Report (2019-06-24 to 2019-06-27)====
-(…)+Video, poster and wiki were improved based on the feedback we had from teachers and supervisors. Project is closed.